Established the optimal standardized work process
 
- maintenance of the manufacturing flow Line structure
(regular efficiency analysis of manufacturing line)
- maintenance of quality assurance system by the process
- double checkup for defect of the connection part
Holds the Multi-functional Manpower for the speedy work
 
- productive capacity per worker:2000pcs/day
Established the automation for the simplified work process
 
- substituted the simplified automated system for repetitive work process (efficient use of manpower)
- daily-basis checking/inspection to strengthen quality assurance
- manufacturing individual’s responsibility system for quality assurance
   
 
Acquired the quality certification for process by simplified automated process
 
- individual’s responsibility system or quality assurance by process for section
Holds the automated cutting and peeling machines for the Communication cable work
 
- reduced the Customer Lead time by the speedy work
Increased productivity thru the improved process (Capa. : 300K cables/month)
 
- regular team discussion activity